Projects

April 2024

HITACHI ZOSEN INOVA

Repair of damaged paint coatings on the steel structureVantaa, Finland

March 2023 - CURRENTLY

STANDARDKESSEL BAUMGARTE GMBH

Repair of damaged paint coatings on the steel structure, Liverpool, UK.

March 2024 – April 2024

APT GLOBAL MARINE AND OFFSHORE BV

Delivery of cargo transport technology and support using rope access techniques for pipeline installation on an offshore wind turbine installation platform. Vlissingen, The Netherlands.

April 2024

POLSKIE ELEKTROWNIE WIATROWE SP. Z O.O

Inspection of anti-corrosion coatings of wind turbine masts, Inowrocław, Wrzesnia, Poland

November 2023 – December 2023

KEAFER S.A.

Installation of pipeline and boiler insulation, Jedlicze, Poland

November 2023 – CURRENTLY

JWW INVEST S.A.

Repairs of the damaged underlay coating and final painting with a full painting system of the surface of the steel structure of the HRSG Boiler, the inlet and outlet ducts and the secondary structure. Ostrołęka, Poland

November 2023

UNIBEP S.A.

Delivery of an executive design for insulation of industrial SCR reactors, exhaust gas ducts and a pipeline. Zdzieszowice, Poland.

Execution time: September 2023 – currently

Mostostal Zabrze Realizacje Przemysłowe S.A.

Repair of damaged paint coatings on the steel structure, Targówek, Poland. 

Execution time: September 2023 - February 2024

Andritz Oy

Final cleaning, repair of damaged paint coatings on the steel structure, Frovi, Sweden. 

Execution time: September 2023 – currently

Zauner Anlagentechnik GmbH

Repair of damaged paint coatings on the steel structure, Iceland.  

Execution time: April 2023 - currently

Polimex Mostostal S.A.

Final cleaning, repair of damaged paint coatings on the steel structure, Puławy, Poland. 

Execution time: July 2023 - currently

Kaefer S.A.

Installation of pipeline and boiler insulation, Oświęcim, Poland. 

Execution time: August 2023 - currently

Sumitomo SHI FW

Repair of damaged paint coatings on the steel structure, Rheinberg, Germany.  

Execution time: October 2022 - July 2023

Valmet AB

Final cleaning of the boiler building, making repairs to damaged paint coatings on the steel structure and piping in the boiler building and neighboring facilities. Husum, Sweden.

Execution time: November 2022 – February 2023

Valmet Technologies Oy

Final cleaning of the boiler building, making repairs to damaged paint coatings on the steel structure and piping in the boiler building and neighboring facilities. Braunschweig, Germany.

Execution time: November 2022 - August 2023

BASF GmbH

Final cleaning, repair of damaged paint coatings on the steel structure, corrosion protection of platforms. Schwarzheide, Germany.

Execution time: July 2022 – January 2023

Valmet AB

Final cleaning of the boiler building, making repairs to damaged paint coatings on the steel structure and piping in the boiler building and neighboring facilities. Gothenburg, Sweden.

Execution time: July 2022 - August 2023

Mostostal Zabrze Realizacje Przemysłowe S.A

Final cleaning, repair of damaged paint coatings on the steel structure, corrosion protection of platforms. Schwarzheide, Germany.

Execution time: October 2022 – February 2023

UNIBEP S.A.

Removal of the old facade made of reinforced concrete slabs. Supply and installation of a steel substructure attached to reinforced concrete columns, plane derivation and installation of a new façade made of sandwich panels, along with window joinery and gates, fire protection. Work in winter conditions at Schumacher Packaging’s active production facility in Myskow, requiring the maintenance of appropriate temperatures.

Execution time: May – July 2022

Bertsch Energy GmbH

Surface preparation and corrosion protection of the steel structure of the gas boiler. Kemsley, UK.

Execution time: May – November 2022

Stahl und Anlagenbau Schädlich GmbH

Final cleaning, repair of damaged paint coatings on the steel structure, corrosion protection of platforms. Schwarzheide, Germany.

Execution time: June – July 2022

EON Ltd.

Final cleaning of the engine room building, making repairs to damaged paint coatings on the steel structure and piping in the engine room building and neighboring facilities. Kemsley, UK.

Execution time: April 2022 - June 2023

UNIBEP S.A.

Removal of the old facade and roof sheathing. Removal of the steel structure of the roof for the installation of the boiler. Delivery and installation of a new façade made of sandwich panels including straightening of the façade plane, delivery and installation of an additional steel structure, delivery and installation of a roof steel structure, roof sheathing, and construction of a lightning protection system and gutter and rainwater pipe heating system.

Execution time: April – May 2022

Sulzer & Schmid Laboratories AG

Condition inspections of wind turbine blades using a drone during the VESTAS inspection campaign in Finland.

Execution time: April – May 2022

Sulzer & Schmid Laboratories AG

Condition inspections of wind turbine blades using a drone during the VESTAS inspection campaign in Finland.

Execution time: October - December 2021

Andritz Oy

Final cleaning of the boiler building, making repairs to damaged paint coatings on the steel structure and piping in the boiler building and neighboring facilities. Uppsala Sweden.

Execution time: March 2022 – January 2023

Zauner Anlagentechnics GmbH

Implementation of anti-corrosion and fire protection of steel structures. Copenhagen Denmark.

Execution time: March – April 2022

UNIBEP S.A.

Surface preparation and corrosion protection of the steel structure of the boiler building at EC Cieszyn.

Execution time: June – July 2022

EON Ltd.

Final cleaning of the engine room building, making repairs to damaged paint coatings on the steel structure and piping in the engine room building and neighboring facilities. Kemsley, UK.

Execution time: July 2022 - August 2023

Mostostal Zabrze Realizacje Przemysłowe S.A

Final cleaning, repair of damaged paint coatings on the steel structure, corrosion protection of platforms. Schwarzheide, Germany.

Execution time: October 2022 – February 2023

UNIBEP S.A.

Removal of the old facade made of reinforced concrete slabs. Supply and installation of a steel substructure attached to reinforced concrete columns, plane derivation and installation of a new façade made of sandwich panels, along with window joinery and gates, fire protection. Work in winter conditions at Schumacher Packaging’s active production facility in Myskow, requiring the maintenance of appropriate temperatures.

Execution time: June – July 2021

Sumitomo SHI FW

Surface-abrasive treatment of the steel structure of the boiler interior during the boiler overhaul.

Execution time: September 2021

Valmet Technologies OY

Corrosion protection of steel structures at the Hofor Power Plant in Copenhagen, Denmark.

Execution time: May 2021 – February 2022

BASF Oy

Final cleaning of the main buildings of BASF’s battery factory, making repairs to damaged paint coatings on the steel structure, facade, and piping, insulation and machinery, as well as in neighboring facilities. Construction of part of the epoxy floors. Installation of anti-slip overlays.

Execution time: January 2020

LAB S.A.

Application of protective paint coatings has galvanized supports and selected pipelines in the HCL Tank Room at the Hofor Power Plant in Copenhagen, Denmark.

Execution time: January - February 2020

Valmet Technologies OY

Performing corrosion protection repairs to steel structure elements, pipelines and equipment at the biomass incineration plant facility in Kalundborg, Denmark.

Execution time: October 2020 – March 2021

Mitsubishi Hitachi Power Systems Europe GmbH

Anti-corrosion work and surface-abrasive treatment (sandblasting) of steel structures and the chimney structure on the site of the newly built power unit at the Żerań Power Plant.

Execution time: August - December 2019

Valmet Technologies OY

Repair of corrosion protection of steel structure elements, pipelines
and equipment at the biomass incineration facility in Kalundborg DK.

Execution time: August – December 2019

Doosan Skoda Power s.r.o.

Repair of damaged paint coatings on selected elements of the steel structure
and pipelines in the turbine plant building, at the Hofor Eektower site in Copenhagen, Denmark.

Execution time: October - November 2019

Tauron Serwis Sp. z o.o.

Cleaning of the steel structure of the plates and casing plates of transmission tower No. 2, together with restoration of damaged anti-corrosion coatings in Jaworzno.

Execution time: August 2019

„STRUCTURAL STEEL FABRICATION PLANT UKRSTAL ZHYTOMYR`` LIMITED LIABILITY COMPANY

Paint repairs of steel elements of the silo support structure on the project “Construction of the flue gas cleaning system with modernization of OPG 230 boilers at ZW Nowa” at the Katowice Steelworks.

Execution time: October - November 2019

Doosan Skoda Power s.r.o.

Repairing damaged paint coatings on a gearbox unit in Margam and Templeborough, UK.

Execution time: August 2019

PMUE Remak S.A.

Final cleaning of the boiler building, repair of damaged paint coatings on the steel structure and selected pipelines in the boiler building and neighboring facilities, as well as inscription on the facade at the waste incinerator facility – MPEC Olsztyn.

Execution time: June 2019

Doosan Skoda Power s.r.o.

Performance of corrosion protection on the indicated elements of the structure at Fortum Zabrze.

Execution time: May - October 2019

GE Power Sp. z o.o.

Performance of painting corrections of objects and steel structures on the project “Construction of flue gas cleaning system with modernization of OPG 230 boilers at ZW Nowa” at the Katowice Steelworks.

Execution time: July - October 2019

Valmet Technologies Inc

Surface preparation, restoration of anti-corrosion coatings and topcoating of steel structures of the Hofor Power Plant in Copenhagen, Denmark – scope M2.

Execution time: May - December 2018

Valmet Technologies Oy

Surface preparation, restoration of anti-corrosion coatings and topcoating of steel structures of the Hofor Power Plant in Copenhagen, Denmark.

Execution time: January 2019

Doosan Skoda Power s.r.o.

Repair of damaged coatings and application of final coating on pipelines in Templeborough, UK.

Execution time: February - December 2019

Valmet Technologies Oy

Surface preparation, restoration of anti-corrosion coatings and topcoating of steel structures of the Hofor Power Plant in Copenhagen, Denmark.

Execution time: October 2018

LAB S.A.

Performing corrosion protection on the bag filter and crane beams at the Hofor Power Plant in Copenhagen, Denmark.

Execution time: November 2018

Doosan Skoda Power s.r.o

Painting corrections on the steel structure of the Hofor Power Plant in Copenhagen, Denmark.

Execution time: December 2018 - July 2019

SUMITOMO SHI FW ENERGIA POLSKA SP. Z O.O.

Structural cleaning and paint touch-ups and cleaning work at Fortum Zabrze

Execution time: August 2018

Doosan Skoda Power s.r.o.

Pipeline marking, anti-corrosion and cleanup work in Margam UK.

Execution time: Annually since 2012

Pratt&Whitney Kalisz

Annual review of fall protection systems PWK Kalisz

Execution time: September 2018

Remak S.A.

Repair of anti-corrosion coatings of NIDa and accompanying steel structures, Dąbrowa Górnicza

Execution time: June 2018

Grupa Azoty Police Serwis Sp. z o.o.

Repair of corrosion protection of 110 kV overhead line poles with maintenance of foundations

Execution time: June - September 2018

Babcock&Wilcox Volund A/S

Pipeline marking, anti-corrosion and cleanup work in Margam UK.

Execution time: September - November 2018

ZK-TERMOCHEM s.r.o.

Painting corrections on the steel structure of the Hofor Power Plant in Copenhagen, Denmark.

Execution time: July 2017

Dornan Engeenering Ltd (Kantor Energy Ltd)

Surface preparation and painting of the steel structures of the Holbrook biomass incinerator in Sheffield, UK. The work was performed using rope access techniques.

Execution time: November 2017 – March 2018

Hitachi Zosen Inova AG (Covanta Europe Engineering Ltd.)

Surface preparation, corrosion restoration and topcoating of steel structures of a waste incinerator in Dublin, Ireland. The work was performed using rope access techniques.

Execution time: August - October 2017

Valmet Technologies Oy

Surface preparation, restoration of anti-corrosion coatings and topcoating of steel structures of Hofor Power Plant

Execution time: February – July 2016

Foster Wheeler AG

Surface preparation, renovation of anti-corrosion coatings of steel structures of the power unit of the Tychy Power Plant. The work was performed using rope access techniques.

Execution time: September – October 2016

Ovivo Aqua Austria GmbH

Surface preparation and painting of steel structures of filter housings and silos at Kozienice Power Plant.

Execution time: May – June 2017

Mitsubishi Hitachi Power Systems Europe GmbH

Surface preparation, restoration of anti-corrosion coatings and topcoating of steel structures of coal chute structures at Kozienice Power Plant.

Execution time: November 2015

Doosan Skoda Power s.r.o.

Renovation of anti-corrosion coatings for steel structures and pipelines at the Vartan Power Plant in Stockholm, Sweden. The work was performed using rope access techniques.

Execution time: March – April 2016

Zampap S.A.

Surface preparation, restoration of anti-corrosion coatings and topcoating of steel structures of silos at the Tychy Power Plant. The work was performed using rope access techniques.

Execution time: April – July 2016

Hitachi Zosen Inova AG

Surface preparation, renovation of anti-corrosion coatings of steel structures of waste incineration plant Poznań. The work was performed using rope access techniques.

Execution time: September – November 2015

LAB S.A.

Surface preparation and restoration of anti-corrosion coatings for steel waste structures in Plymouth Devonport, UK. The work was performed using rope access techniques.

Execution time: September 2014 – June 2015

Baumgarte Boiler Systems GmbH (JFE Engineering Group)

Surface preparation and restoration of anti-corrosion coatings for steel structures of a waste incinerator in Plymouth Devonport, UK. The work was performed using rope access techniques.

Execution time: August 2015

Energomontaż Zachód S.A.

Fabrication and installation of pipelines along with post-installation corrosion protection at the Tychy Power Plant.

Execution time: July – August 2014

Jacobs ENC Ltd.

Surface preparation and painting of steel structures of the Glenerothes biomass incinerator in Scotland. The work was performed using rope access techniques.

Execution time: September 2014 – June 2015

Baumgarte Boiler Systems GmbH (JFE Engineering Group)

Surface preparation and restoration of anti-corrosion coatings for steel structures of a waste incinerator in Plymouth Devonport, UK. The work was performed using rope access techniques.

Execution time: August 2015

Energomontaż Zachód S.A.

Fabrication and installation of pipelines along with post-installation corrosion protection at the Tychy Power Plant.

Execution time: March 2014

Doosan Skoda Power s.r.o.

Renovation of anti-corrosion coatings and topcoating of steel structures of the Lund/Ortofta Power Plant in Sweden. The work was performed using rope access techniques.

Execution time: April – June 2014

Hitachi Zosen Inova AG

Renovation of anti-corrosion coatings and topcoating of steel structures of the Vaanta Power Plant in Finland. The work was performed using rope access techniques.

Execution time: June 2014

LAB S.A.

Renovation of anti-corrosion coatings and topcoating of steel structures of the Vaanta Power Plant in Finland. The work was performed using rope access techniques.

Execution time: August 2013 – February 2014

Hitachi Zosen Inova AG

Surface preparation, restoration of anti-corrosion coatings and topcoating of steel structures in Billingham, UK. The work was performed using rope access techniques.

Execution time: February – March 2014

Foster Wheeler Energia Oy

Surface preparation and painting of steel structures of the Lund Power Plant in Sweden. The work was performed using rope access techniques.

Execution time: March 2014

Hitachi Zosen Inova LTD

Surface preparation and restoration of anti-corrosion coatings for steel structures of the Lucerne Power Plant in Switzerland. The work was performed using rope access techniques.

Execution time: October 2012

Polimex Mostostal S.A.

Surface preparation, restoration of anti-corrosion coatings and topcoating of steel structures of Linkoping waste incineration plant
Sweden. The work was performed using rope access techniques.

Execution time: January – May 2013

Metso

Surface preparation, corrosion restoration and topcoating of steel structures of the Glenerothes biomass incinerator in Scotland. The work was performed using rope access techniques.

Execution time: June 2013

Andritz Oy

Surface preparation, anti-corrosion coating renewal and topcoating of the steel structures of the Iggesund BioMass CHP biomass incinerator in Workigton, UK. The work was performed using rope access techniques.

Execution time: 2012

Polimex Mostostal (GW Babcock & Wilcox Volund A/S)

Renovation of anti-corrosion coatings of steel structures ca 400 Mg, Landskrona waste incineration plant (Sweden). The work was performed using rope access techniques.

Execution time: April – June 2012

NCC

Surface preparation, restoration of anti-corrosion coatings and topcoating of steel structures of the Filborna KVV1 Combined Heat and Power Plant in Helsingborg, Sweden.

Execution time: October - December 2012

Foster Wheeler AG

Surface preparation, restoration of anti-corrosion coatings and topcoating of steel structures of Połaniec Power Plant. The work was performed using rope access techniques.